Compact glazed spaces

Apple cabins, defined by the operation.

A compact rounded cabin direction for guest rooms and customer-facing spaces. Start with the people, room functions, view and site conditions; then align the glazing, interior, utilities and supply boundary.

  • Guest-room, reception and small service-space directions
  • Bathroom, furniture, equipment and privacy reviewed by use
  • Quantity, access and local site work confirmed before quotation

AI-generated exterior concept, not a product photograph or construction drawing. Final appearance, dimensions, materials, equipment, performance, certification and site work require project confirmation.

AI-generated Apple Cabin exterior concept at night with warm interior lighting, not a product photograph
AI-generated concept visual. Not a product photograph or construction drawing. Illustrated fit-out and site work are not confirmed supply.

Model planning

Choose a planning reference.

These codes identify product-planning directions. Confirm the current drawing, layout, equipment and supply scope for your project before comparing quotations.

HJ-AP18
6 m primary planning direction

Start the room brief here. Confirm usable internal space, openings and selected equipment against the project-approved drawing.

HJ-AP21
Separate 7 m planning direction

Request its own drawing and configuration schedule. Do not combine its dimensions, materials or equipment with the 6 m direction.

Planning codes are not a factory nameplate or a confirmation of standard inclusion. Photos elsewhere on this page remain visual references unless explicitly identified otherwise.

Discuss the selected direction
Typical role
Compact guest room, reception or customer-facing space.
Design priority
Room function, privacy, view and operating flow.
Quotation basis
Confirmed layout, interior, quantity and destination.
Local boundary
Foundation, unloading, positioning and connections assigned by project.

Choose by use

One shell can serve different jobs.

The product name does not define the room. Occupancy, wet areas, equipment, customer movement and staff access shape the useful configuration.

01

Guest rooms

Define sleeping, seating, bathroom, storage, privacy and housekeeping access.

02

Resort clusters

Plan orientation, spacing, service routes and a repeatable first-phase configuration.

03

Reception points

Describe staff positions, guest flow, storage, signage and required equipment.

04

Small service spaces

Identify people, loads, utilities and maintenance access before choosing openings and finishes.

Apple cabin interior with curved panoramic glazing, visual reference
Interior directionVisual reference. Furniture, equipment and finishes follow the confirmed project scope.

Operation before finish

Use the glazing without losing privacy or function.

A broad view can support the guest experience, but orientation, curtains, equipment walls and climate conditions still need to work for the destination.

Best fit
Compact guest rooms, resort clusters and small customer-facing spaces.
Decide first
Occupancy, bathroom, entry, view direction, privacy and operating flow.
Send us
Destination, quantity, site access, room plan and required equipment.

Configuration scope

Put the room and site interfaces on one list.

This is a coordination checklist, not a promise of standard inclusion. Each line is confirmed against the buyer brief and destination.

01

Envelope

Overall cabin direction, external finish, openings, glazing and weather interfaces.

Confirm by project
02

Room plan

Occupancy, bathroom, furniture, storage, staff access and equipment clearances.

Confirm by project
03

Privacy & solar control

Orientation, curtains or blinds, adjacent-unit sightlines and destination climate inputs.

Confirm by project
04

Utilities

Destination voltage, lighting, water, drainage, climate equipment and connection points.

Where required
05

Interior & controls

Finish direction, manual controls and optional access, lighting or climate integration.

Optional scope
06

Delivery interface

Transport basis, road access, unloading, positioning, foundation and external connections.

Before quotation

From brief to quotation

Three decisions before price.

A structured scope makes supplier comparisons more useful and reduces assumptions after quotation.

01 · Define the operating brief

You send

Destination, use, quantity, occupancy, equipment and target timing.

We check

Missing room, privacy, utility, access and local-work information.

02 · Align configuration

Together

Confirm openings, interior, equipment, utilities, controls and delivery interfaces.

Boundary

Assign foundation, unloading, positioning, connections and destination compliance work.

03 · Prepare the proposal

Commercial basis

Use the agreed configuration, quantity, delivery basis and responsibility split.

Control point

Resolve remaining technical exceptions before order documents are finalized.

Optional smart living

Simple controls for a compact room.

Choose functions that reduce friction for guests and staff while keeping everyday operation clear.

Discuss smart options
01

Comfort scenes

Coordinate selected lighting, curtains or blinds, and compatible climate equipment for arrival, rest and check-out routines.

02

Access and awareness

Discuss smart locks, door status, occupancy, smoke and water-leak sensing according to the operating plan and local requirements.

03

Practical control

Keep clear wall controls for guests, with optional app or hospitality-system access for authorized operators.

Confirmed before quotation

Smart functions are optional. Device brands, protocols, voltage, network or gateway needs, app availability, local compatibility and commissioning responsibility are defined by project. Life-safety devices must follow destination codes.

Catalogue photograph

From the catalogue.

This photograph is reproduced from the supplied Apple Cabin catalogue. It is separate from the illustrative scene images elsewhere on this page.

Catalogue photograph of white rounded glazed cabins in a custom stacked arrangement with an upper terrace, not verified as HJ-AP18 or HJ-AP21
Archive photograph · custom stacked arrangementFrom the supplied 2026 Apple Cabin catalogue, page 5. Not verified as HJ-AP18 or HJ-AP21. The image does not establish dimensions, structural suitability or a standard supplied package.

Keep the photograph and model schedule separate.

HJ-AP18 remains the primary 6 m planning direction; HJ-AP21 is a separate 7 m direction. Neither code has been matched to this photograph.

For the selected single-unit model, request a matching exterior photograph, interior photograph, dimensioned drawing and included/optional schedule. Do not use this custom arrangement as a standard single-unit specification.

Materials and equipment must follow the selected model's current schedule. The 7 m material sheet is not a substitute for the 6 m production schedule.

Discuss the model and photo set

Make the first reply useful

Send six project facts.

A marked-up plan, reference image or written brief is enough to begin the scope review.

Open project brief
  1. 01Destination

    Country, city and site setting.

  2. 02Intended use

    Guest room, reception or service space.

  3. 03Quantity

    First phase and possible later phases.

  4. 04Room scope

    Bathroom, furniture, equipment and privacy.

  5. 05Site access

    Road, unloading, foundation and utilities.

  6. 06Timing

    Decision schedule and required site date.

Before you enquire

Useful answers, without assumptions.

Only the confirmed project documents define the supplied cabin.

Is the apple cabin a fixed standard configuration?

No. The website shows a product direction. The quotation and technical documents define dimensions, openings, interior, equipment and delivery scope.

Can it be a guest room or commercial space?

Both directions can be discussed, but occupancy, bathroom, storage, equipment, utilities and operating requirements must be defined.

How should the glazing be planned?

Orientation, privacy, solar exposure, curtains or blinds, climate inputs and destination requirements should be reviewed together.

What is needed for a quotation?

Send the destination, use, quantity, target layout, interior scope, site access, utilities and decision timing.

Are transport and installation included?

The transport basis, unloading, positioning, foundation, installation support and local connections are assigned before quotation.

Use-led proposal

Send the use, site and first quantity.

We will identify the missing technical inputs and responsibility boundaries before preparing a commercial proposal.

Buyer checklist

Compare the configuration, not only the silhouette.

Use these questions when reviewing the current model drawing and project quotation.

How should I compare Apple Cabin layouts?

Ask for one model drawing and its matching configuration schedule. Compare external dimensions, clear internal space, bathroom position, glazing and equipment on the same revision. Do not combine dimensions from one configuration with materials from another.

What should a smart-control request include?

List the functions you want, who will operate them and the available site network. Ask which devices, gateways, manual controls and commissioning tasks are included. A smart-living illustration is not an equipment schedule.

What should I send if I do not have a drawing?

Describe the intended use, number of occupants, bathroom needs, first-phase quantity and destination. Add a simple sketch or reference image if available; exact dimensions and supply scope still need confirmation.